Atrium elevation of the Block A
Viewed: 193 time(s)
|
Bathroom Floor and Wall tiles in place
Viewed: 217 time(s)
|
EB Metering Room getting ready
Viewed: 206 time(s)
|
Lift Area being prepared for Carriage erection
Viewed: 176 time(s)
|
Lift Head Room
Viewed: 181 time(s)
|
Outer Plastering Work is in full Swing
Viewed: 179 time(s)
|
Putty work is in porgress at the common Area
Viewed: 177 time(s)
|
Swimming Pool getting its shape
Viewed: 173 time(s)
|
Third Tile Option for the Bathroom
Viewed: 199 time(s)
|
Transformer form EB in place
Viewed: 180 time(s)
|
Air Tight Fenesta windows offers complete insulati
Viewed: 190 time(s)
|
Block A East wing Outer elevation getting its orna
Viewed: 222 time(s)
|